Porta cabins inside a modular fabrication facility
End-to-End Cabin DeliverySupply to final positioning.
Project team reviewing modular cabin plans
Who we are

Modular infrastructure with the transport plan built in.

OATANDBELLA NIGERIA LIMITED is a wholly Nigerian company focused on the sale, transportation and installation of porta cabins, pre-fabricated homes and pre-fabricated homes and modular infrastructure solutions.

Instead of leaving a client to separately coordinate the unit, transport and site placement, our model connects those stages into one practical delivery path — from requirement and cabin selection through movement to the destination and final setup.

Customizable formatsLayouts, finishes and optional utilities matched to use.
Deployment focusedSolutions built around faster site readiness.
Cabin-specific haulageTransport planned around modular unit dimensions and handling.
Nationwide applicationsConstruction, oil & gas, government, education, healthcare and commercial sites.
More About OATANDBELLA →
What we do

One coordinated path from cabin selection to site readiness.

Our service scope is built around modular cabins — not general freight. We support the stages required to get a selected cabin to its intended location and ready for use.

View Services →
01
S

Cabin Supply

Select and configure the appropriate expanding, packaging, folding or Apple Capsule format.

02
T

Cabin Transportation

Move the modular unit from fabrication, storage or an existing site to the required destination.

03
P

Offloading & Positioning

Coordinate lifting, offloading and final placement using appropriate handling equipment where required.

04
I

Installation & Setup

Complete assembly, stability checks and agreed utility/fit-out connections for site readiness.

Scope clarity: “Haulage” on this website refers specifically to transportation and relocation of porta cabins and modular units between locations.
How a typical project moves

Requirement to handover, in clear stages.

For a typical 20 ft cabin, the company profile presents an indicative end-to-end programme of approximately one to two weeks, subject to scope and project conditions.

Requirements & Design

Confirm use, layout, dimensions, finishes, utilities and destination constraints.

Fabrication / Preparation

Prepare the cabin to the approved specification and complete pre-delivery checks.

Cabin Transportation

Secure and transport the finished unit to the agreed project location.

Placement & Setup

Offload, position, assemble and connect agreed utilities or fittings.

QA/QC & Handover

Complete final inspection, walkthrough and handover documentation.

A visual look

See the cabin format and finish up close.

Watch product footage showing a completed modular cabin format and the practical details that make these units adaptable for offices, accommodation and support spaces.

This section can continue to feature OATANDBELLA project and product videos as more installation and delivery footage becomes available.

Explore the Product Gallery →
Where modular works

Flexible infrastructure for multiple sectors.

View Applications →
OG

Oil & Gas / Industrial

Site offices, staff accommodation, guard rooms, clinics and support facilities for operating locations.

CN

Construction

Project offices, temporary accommodation, meeting rooms and relocatable site support spaces.

GV

Government

Rapid-deployment offices, public programme facilities and accommodation solutions.

ED

Education

Classrooms, staff rooms, administration spaces and temporary learning infrastructure.

HC

Healthcare

Clinics, consultation spaces, medical support rooms and temporary health facilities.

CM

Commercial & Hospitality

Workspaces, short-let concepts, resorts, executive accommodation and modular retail/support uses.

Cabin gallery

See the formats, finishes and deployment possibilities.

Images shown are drawn from OATANDBELLA’s supplied business proposal and product gallery.

From Frame to Finish

Before and after: from structure to finished home.

A compact look at how a pre-fabricated build can move from installation stage to a completed, ready-to-use home.

Pre-fabricated home during structural installation stageBefore
Structural setup and installation stage
Completed pre-fabricated home after finishing and exterior worksAfter
Completed, finished and ready for use
Built for speed. Delivered with confidence.We help move projects from structural assembly to finished, functional space with coordinated delivery and quality-focused execution.
Ready to deploy?

Tell us what space you need and where it is going.

We can help you select the right cabin, plan its transportation from origin to destination, position it on site and coordinate installation.

Configure & Request RFQ →